Logo

Discover secure and profitable multifamily real estate investments. Achieve financial growth and stability with our expert guidance and management.

Our Portfolio

Our Portfolio

+15122897167

2600 Lost Mine Trail, Leander, TX 78641

dennis@mcqproperties.net

Why make-ready is a profit center

Every idle day between move-out and listing is rent you’ll never recover. Tight make-ready execution can add thousands to annual NOI with no rent hike. Treat it like an assembly line: standardized, measurable, and relentlessly optimized.

Define “rent-ready” clearly

Create a Rent-Ready Standard with photo examples and acceptance criteria for: paint, floors, appliances, hardware, lighting, caulk/cleanliness, safety items, and smart-home devices (if any). Publish it for staff and vendors. Shared clarity prevents rework and failed inspections.

Map the turn process

Typical steps:

  1. Pre-notice/pre-leasing: When a notice to vacate is received, start marketing the unit with realistic photos or a sister-stack layout. Pre-schedule vendors aligned to the anticipated move-out.

  2. Move-out day: Conduct a same-day move-out walk with a punch-list app. Document damages with time-stamped photos.

  3. Work order dispatch: Within 4 hours, dispatch cleaners, painters, and maintenance in a pre-set order that avoids trade conflicts.

  4. Parts & materials: Keep a par sheet of consumables (filters, caulk, bulbs, smoke alarms, blinds). Stock on site to prevent store runs.

  5. Quality check: Supervisor inspects against the Rent-Ready Standard within 24 hours of vendor completion.

  6. List immediately: As soon as it passes QC, publish with accurate photos/virtual tour, price via dynamic guidelines, and open for self-guided tours if possible.

Scheduling that eliminates idle time

  • Vendor calendars: Pre-block weekly time slots for turns; don’t rely on ad-hoc requests.

  • Trade sequencing: Example—trash-out → paint → maintenance checklist → clean → QC.

  • Weekend coverage: A small, rotating weekend crew can save 2–3 days on many turns.

  • Key control: Digital locks/lockboxes cut handoff delays.

The punch-list that saves hours

Standardize your Turn Punch-List: HVAC filter, GFCIs, smoke/CO alarms, blinds, door sweeps, caulk lines, grout touch-ups, drip pans, appliance function tests, water shutoffs, and leak checks. Technicians check boxes with photos—no ambiguity.

Pricing & marketing sync

The goal is to list instantly at the right price:

  • Dynamic pricing rules: If like-units sit >7 days, reduce by a set increment; if traffic > target, test a small increase.

  • Priority exposure: Feature fresh turns on your website hero, ILS, and Google Business Profile.

  • Tour readiness: Place QR codes in the unit for applications and FAQs; enable same-day self-guided tours.

KPIs that matter

  • Average Turn Time (keys-to-list): Target 3–5 calendar days for classic turns, 7–10 for heavy turns.

  • Cost per Turn: Track by vendor and unit type; negotiate with data.

  • First-Pass Yield (FPY): % of turns passing QC on first inspection; target >85%.

  • Make-Ready On-Time Completion: Target >90% within SLAs.

  • Days Vacant: Watch the last 30-60-90 days trend by floorplan.

Cost control without quality drag

  • Bundled services: Negotiate painting + cleaning + trash-out as a package.

  • Volume discounts: Annual bid cycles for consistent rates; add KPIs to contracts.

  • Refinish vs. replace: Tub/glaze, countertop resurfacing, and LVP repairs can shorten turns and lower capex.

Technology stack

  • Work order app: Mobile-first with photo capture and timestamps.

  • Inventory tool: Track consumables and auto-reorder thresholds.

  • Self-tour tech: Reduces scheduling friction and accelerates lease-ups.

  • Turn dashboard: A shared board shows each unit’s stage, owner, and ETA.

Avoid these blockers

  • Unclear standards: Leads to QC failures and rework.

  • Material shortages: Keep buffer stock, especially during peak move seasons.

  • Vendor no-shows: Maintain a B-team roster and enforce SLAs with penalties.

30-day sprint plan

  1. Publish rent-ready standards + photo guide.

  2. Pre-schedule vendor blocks and revise trade sequence.

  3. Launch a live “Turn Board” with owners and due dates.

  4. Track turn time daily; run a weekly stand-up to remove bottlenecks.


Want a plug-and-play make-ready SOP and KPI dashboard for your team?
📅 Book a call: https://mcqproperties.online/calendar-page/

Author

Solve Tech

Leave a comment

Your email address will not be published. Required fields are marked *